# Scheduled generation · Solar thermal generation · Provisional feasible schedule — Spain

- Country: ES
- Timezone: Europe/Madrid
- Public window: 2026-08-15 to 2026-08-22
- Unit: MW

## Today (2026-08-22)

- Average: 918.99 MW
- Minimum: 14.40 MW
- Maximum: 1893.60 MW
- Observations: 96

## Previous seven complete days (2026-08-15 to 2026-08-21)

- Average: 780.36 MW
- Minimum: 4.00 MW
- Maximum: 1790.00 MW
- Observations: 672
